BRASS GARDEN LEDGER // EDITORIAL CHARTER INDEPENDENT STANDARDS • REAL-WORLD BUILD TIMES
Our Approach // Editorial Charter

Behind the Project Notes

Moxberryyardmin was started after watching too many well-meaning homeowners abandon halfway-dug patio trenches on Sunday evening because a glossy internet tutorial claimed a 10x10 paver build takes "three easy hours and $85." In reality, hand-excavating 3.5 cubic yards of compacted clay soil takes an entire morning before a single stone is laid.

We write every project file like a patient neighbor standing beside your sawhorses: candid about where muscles ache, explicit about saw-blade kerf deductions, and upfront about which costs are fixed and which fluctuate by county.

Three Editorial Rules

How We Verify Every Cut List & Budget

01

Actual vs. Nominal Math

Beginners frequently get tripped up when two stacked "2x6" boards measure 11 inches tall instead of 12, or when a "4x4" post measures 3.5 by 3.5 inches. Every diagram and screw length on Moxberryyardmin is calculated using dressed dry lumber dimensions per American Softwood Lumber Standard PS 20.

02

Two-Column Cost Honesty

Instead of inventing a single fake total price, our tables split Confirmed Fastener & Prep Costs (screw boxes, rebar pins, polymeric sand, geotextile) from Rough Regional Bulk Spend (cedar timber, quarry gravel, bulk compost). You never get blindsided at checkout.

03

Solo-Builder Clock Times

Our hour badges assume one person working at an unhurried Saturday pace with basic corded or 18V hand tools—including 45 minutes for layout stringing, tool cleanup, and hosing off the driveway before dark.

Independence & Standards

Technical Benchmarks We Reference

Moxberryyardmin is wholly independent and not affiliated with any big-box hardware retailer, power-tool manufacturer, or prefabricated garden kit company. When specifying materials, we align our weekend guides with publicly documented engineering and horticultural standards:

  • Wood Preservative RetentionAWPA Use Category System (UC3B / UC4A / UC4B)
  • Paver Base & Bedding GradationICPI Tech Spec 2 & ASTM C33 Concrete Sand
  • Raised Bed Soil & Lumber SafetyOregon State & Cornell Cooperative Extension Bulletins
  • Underground Utility SafetyCommon Ground Alliance 811 Call-Before-You-Dig Protocol